Work back from your install date.

Pick the day your installer starts and where the project is. You'll see the latest date to order European windows and doors, and when your plans need to reach us to make it. A LuxHaus project manager is scheduled on site for your installation.

Your project

The day your installer starts setting windows.

Products

Mixed order? Select all that apply. We plan around the slowest.

Shop drawings needed?

Not every project needs them. When required, they add 2–3 weeks for review and sign-off.

Project type

Time on site to receive, check and stage before install.

These dates are estimates, not a delivery commitment. They reflect typical production times and current shipping routes and conditions. Events outside our control can change them, including port congestion, carrier schedule changes, severe weather, strikes, customs inspections, tariff or trade-policy changes, sanctions, armed conflicts, pandemics and other disruptions to global shipping. Your confirmed schedule comes with your quote and order confirmation.

About Lead Time Planner IQ

Works back from your installation date to the latest date to order European windows and doors, including production by material, shop drawings, shipping to your region and a delivery buffer. Free, no login.

Who it is for

Builders, architects and homeowners scheduling a project with imported windows and doors.

How it works

  1. Pick the install date and project location (United States, Canada, GCC, Caribbean or Mexico).
  2. Choose the materials, whether shop drawings are needed, project type and delivery buffer.
  3. Flag hurricane-zone approvals or project-specific testing if they apply.
  4. See the latest order date and the date your plans should reach LuxHaus.

Frequently asked questions

How long do European windows take to arrive?

It depends on material and destination: production varies from a few weeks for uPVC to several months for steel, plus shop drawings when required and ocean shipping to your region. The planner calculates it for your project.

When should I order windows for a new build?

Work back from the install date: production, shipping, receiving and any approvals. Lead Time Planner IQ gives the latest safe order date.

Are the dates guaranteed?

No. They are typical estimates; the final schedule comes with the quote and order confirmation.